Optimized Industrial Extraction Chilling 

Optimized Industrial Extraction Chilling 

May 26, 2020

Whether your extraction process is using pure ethanol or CO2 with a winterization step, a low temperature chilling solution is needed. As ethanol extraction processes... (continue reading)

Standard Maintenance and Upkeep

Standard Maintenance and Upkeep

Dec 20, 2019

All equipment requires some kind of periodic maintenance. Being both vital to production and a major investment, glycol chillers are no exception. The questions are... (continue reading)

Chillin’ in the Winter

Chillin’ in the Winter

Dec 20, 2019

How to keep your glycol chiller operating reliably with old man winter breathing down your neck. Most people enjoy a snow filled holiday season, but... (continue reading)

Basic Piping for Glycol Chilling

Basic Piping for Glycol Chilling

Nov 12, 2019

There are a variety of materials that can installed for you glycol piping system. GF Coolfit, Pre-Insulated PVC80, welded stainless steel, copper tubing etc. With... (continue reading)