How We Engineered a Custom Chiller Solution for Wild Turkey Bourbon January 14, 2026 By Scott Timms, G&D Chillers, Business Development Manager Intro: Wild Turkey Bourbon faced a critical challenge: a failing chiller system that threatened plant-wide operations. With tight space constraints, limited power availability, and zero tolerance for downtime, standard replacement equipment wasn’t an option. They needed a custom-engineered solution—and fast. The Challenge Failing chiller system nearing end of life Limited mechanical footprint Restricted electrical capacity Critical production schedules with no margin for error Need for a direct replacement without facility modifications Our Solution To meet these demands, G&D Chillers designed and delivered a fully customized system: Stacked Design: Two units engineered into a single footprint Drop-In Compatibility: Matched flanges and custom electrical connections Power-Conscious Engineering: Operates within existing electrical limits Accelerated Delivery: Engineered, built, and shipped in just 12 weeks The Results Avoided plant-wide downtime Reduced installation and commissioning risk Delivered a reliable, long-term cooling solution Met aggressive timeline without compromising performance Built for Real-World Constraints This project reflects G&D Chillers’ commitment to solving operational challenges—not forcing facilities to adapt to standard equipment. By engineering around space, power, and operational realities, Wild Turkey Bourbon replaced critical cooling infrastructure without disrupting production. Want to see how this custom solution came together? ▶️ See the full build in action—watch the Wild Turkey Bourbon chiller walkthrough!